Engineering Construction Company Jobs

Engineering Construction Company

Career Opportunities at Engineering Construction Company for Highway Project in KPK Project Manager B.Sc Civil with 10-15 years experience in Construction Industry Construction Manager B.Sc Civil with 7-10 years experience in Construction Industry Site Engineer  D.A.E Civil with 5-10 years experience in Construction Industry Quantity Surveyor D.A.E/B.Tech with 10 years experience in Construction Industry To apply … Read more

Sukkur IBA University MBA Admission

Sukkur IBA University MBA Admission

Sukkur IBA University MBA Admission 2 year Program IMPORTANT DATES Last Date to Apply: 26 September 2018 STS GAT-General Test: 29 September 2018 Orientation Program: 8 October 2018 Commencement of Classes: 14 January 2019 ELIGIBILITY CRITERIA Candidate must have 16 years education in any field from an HEC recognized University/Institute with minimum 60% marks or … Read more

Riphah International University Admissions Fall 2018

Riphah International University Admissions

Riphah International University ADMISSIONS FALL 2018 Lahore Campus RIPHAH COLLEGE OF VETERINARY SCIENCES Accredited by Pakistan Veterinary Medical Council (PVMC) Affiliated with the Association of American Veterinary Medical Colleges, USA (AAVMC) Doctor of Veterinary Medicine (DVM) 5 years Semester System Eligibility: F.Sc Pre-Medical or equivalent with minimum 2nd Division Live-stock Assistant Diploma Course (LAD) 2 years Annual … Read more

Robowaiter Improvements possible in Project

Results and Discussions This project not only helped us in getting a grasp on Arduino but also taught us to work as a team. We completed our project on time. We achieved all of our goals, so we had time to make further Robowaiter improvements. If we had time, we could have still made alterations … Read more

Robowaiter Control and Path Design for Project

Robowaiter Control and Path Design

Robowaiter Control and Path Design included Robowaiter Control and Path Design Motion Control Logic Motion control is achieved by the collaboration of the IR Sensors and H-bridges. The Robot starts its motion towards the destination only if the order is placed on it. After the placement of order, the Robot is assigned destination with the … Read more